Residential Contractors

(843) 846 - 2500

Weiss Residence: October 2007

October 10, 2007 -- The garage slab has been poured. Just as on the house, the orange lines show where the steel anchor bolts are installed. The front (lower left in the photo) has been formed since that is the entrance and is slightly lower than the walls.
Click Here to return to Weiss Residence: October 2007