Residential Contractors

(843) 846 - 2500

Weiss Residence: October 2007

October 24, 2007 -- Rafters for the shed roofs are being installed. The wall on the right side of the house needs to be recessed a couple of inches. It was removed and is being rebuilt.
Click Here to return to Weiss Residence: October 2007