Residential Contractors

(843) 846 - 2500

Weiss Residence: October 2007

October 31, 2007 -- The floors for the outdoor kitchen (on the right) and pergola (on the left) were poured today. The concrete block column on the right edge is the foundation for the chimney.
Click Here to return to Weiss Residence: October 2007