Weiss Residence: November 2007
|
November 8, 2007 -- The garage roof framing is continuing. The two gaps in the rafters are where dormers will be built. There is also one in the rafters on the far side although it is difficult to see. The dormer on the far (river) side is at the right edge of the roof. |
|
Click
Here to return to Weiss Residence: November 2007