Weiss Residence: November 2007
November 26, 2007 -- The garage roof is sheathed. Dormer walls have to be built. |
Click Here to return to Weiss Residence: November 2007
November 26, 2007 -- The garage roof is sheathed. Dormer walls have to be built. |