Weiss Residence: March 2008
|
March 5, 2008 -- The roof is almost finished. Here on the driveway side, it appear complete. The small shed roof on the right needs to be finished as does the connector between the river side porch and the outdoor kitchen. |
|
Click
Here to return to Weiss Residence: March 2008