Residential Contractors

(843) 846 - 2500

Weiss Residence: March 2008

March 25, 2008 -- The counter top has been poured on the left side of the outdoor kitchen. The left opening is for a steak grill and the right for a fryer. The entire counter top and back wall will be tiled in the next few days.
Click Here to return to Weiss Residence: March 2008