Weiss Residence: March 2008

![]() |
March 25, 2008 -- Backer board is installed in the master bathroom. It will have a floor heater installed and then floor tile. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Weiss Residence: March 2008
![]() |
March 25, 2008 -- Backer board is installed in the master bathroom. It will have a floor heater installed and then floor tile. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |