Weiss Residence: March 2008

![]() |
March 25, 2008 -- The master shower is being prepped for tiling. The floor, walls and ceiling will be tiled. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Weiss Residence: March 2008
![]() |
March 25, 2008 -- The master shower is being prepped for tiling. The floor, walls and ceiling will be tiled. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |