Lord Residence: August 2008
|
August 4, 2008 -- The house is ready for the subfloor today. The brown stacks are the plywood for the subfloor. The tall white pipe just to the left of the chimney was filled with water to test the drain system for leaks. |
|
Click
Here to return to Lord Residence: August 2008