Residential Contractors

(843) 846 - 2500

Lord Residence: August 2008

August 5, 2008 -- The plywood subfloor is being installed. The deck (on the left) is covered with plywood to protect the decking material during the construction process.
Click Here to return to Lord Residence: August 2008