Residential Contractors

(843) 846 - 2500

Weiss Residence: November 2007

November 3, 2007 -- The garage second floor has its subfloor down now. Since this is for storage, this is the only floor it will get (for now). The "L" shaped opening on the lower right side is for the stairwell.
Click Here to return to Weiss Residence: November 2007