Residential Contractors

(843) 846 - 2500

Weiss Residence: November 2007

November 3, 2007 -- The floors for the pergola and outdoor kitchen are poured. The outdoor kitchen (just past the fireplace foundation) will have a wall built on each side. The fireplace will have a glass back so the fire will be visible from the outdoor kitchen.
Click Here to return to Weiss Residence: November 2007