April 1, 2009 -- Here is the tub skirt in the master bath. It is painted an alternate trim color as an accent. The tub will be installed soon.


April 1, 2009 -- Here are the vanity faucets in the master bath. This bathroom is almost finished.


April 1, 2009 -- Here is the trim out for the tub in bath #2. The tub spout isn't on yet but it will be shortly.


April 1, 2009 -- Here is the vanity faucet for bath #2.


April 1, 2009 -- The vanity faucet in bath #3 was installed today. It is oil rubbed bronze in color. The missing drawer face will be installed soon.


April 1, 2009 -- This is the toilet for bath #3. The handle is the wrong color and will need to be changed out.


April 7, 2009 -- This is the kitchen island nearly completed. The riser on top will get another piece of trim at the top of each end pedestal.


April 7, 2009 -- This is a view of the backside of the island. The outlets will be in soon and it will look even better once door pulls are intalled.


April 7, 2009 -- The viking range is all installed and working now. This is a dual oven, 6 burner with a griddle. The sealed burners will make it easy to clean.


April 7, 2009 -- Here is the master bath tub all installed with its faucet.


April 7, 2009 -- Here is the newly built shelves in the studio. There will be adjustable shelves on the left and a hanging rod on the right.


April 7, 2009 -- This is a view into the powder room with the fixtures installed.


April 7, 2009 -- Here is a close up of the powder room vanity. The top is stone tiles and the sink bowl is hammered copper.


April 7, 2009 -- The light fixture is now mounted above the bath 2 vanity. Soon the mirrors will be installed.


April 7, 2009 -- The light is also now mounted above the Bath 3 vanity. This bath is nearly complete.


April 14, 2009 -- This is what the finished paint and door hardware look like in bath 2. The door on the right is a pocket door.


April 14, 2009 -- Here is a view of the door to bath 2 from the bedroom side.


April 14, 2009 -- The two pocket doors in bedroom 3 have their hardware on now. The door on the left is the bathroom and on the right is the closet.


April 14, 2009 -- All of the floors are uncovered and paint finished as well as hardware installed. This is the north gallery with the study doors on the left.


April 14, 2009 -- This is a longer view down the north gallery with the owner's entry door visible at the far end.


April 14, 2009 -- The hardware is now installed on the owner's entry door as well as the closets next to it.


April 14, 2009 -- The other two doors in the owner's entry go to the garage on the left and the laundry on the right.


April 14, 2009 -- Here you can see the owner's entry closet and the computer desk. The desk has a maple top.


April 14, 2009 -- This is the view looking in through the entrance to the master bedroom. Both closets are on the left as you enter.


April 14, 2009 -- The paint is finished in the master bedroom and the floors are uncovered and ready for their final coat of finish.


April 14, 2009 -- The kitchen cabinets are mostly complete now. They will be finished once they have their door and drawer pulls.


April 14, 2009 -- The trusses are now complete with all of their hardware installed. This is the view looking toward the kitchen.


April 14, 2009 -- The great room is now complete. The hearth and fireplace surround is in and the beam trusses are finished.


April 14, 2009 -- Here is an upclose photo of the fireplace with the slate surround installed.


April 14, 2009 -- This is the view of the beam trusses from the kitchen.


April 14, 2009 -- The back wall of the great room looks very nice with its sconces lit up.


April 14, 2009 -- The TV cabinet and bookshelves in the study are nearly complete now. They just need their door hardware to be finished.


April 15, 2009 -- This is the view out back in the bright morning sunshine.


April 15, 2009 -- The pendant lights are now installed. Just a couple more pieces of cabinet trim and panels on the refrigerator and the kitchen is complete.


April 15, 2009 -- Here is a little different perspective of the kitchen. All of the elements of this room tie together very nicely.


April 15, 2009 -- The guest bedroom 2 floor has one top coat on it now. It gets the next top coat tomorrow and will then be finished.


April 15, 2009 -- Guest bedroom 3 also has its first topcoat on. This is a thinned paint that allows some of the grain of the wood to show through.


April 15, 2009 -- The rains have finally stopped and site grading began today. This area in the front is where the courtyard is going to be.


April 15, 2009 -- The final touches will be put on the grading tomorrow and then the courtyard will start.


April 15, 2009 -- The grading will allow the water to naturally drain away from and around the house to the right side.


April 15, 2009 -- We created a slight swale on the right side here to make sure the water goes out and around the house.