January 2, 2009 -- More of the top cabinets were installed in the kitchen today. For the most part, all that is left is the trim around the tops.
January 7, 2009 -- Here is some of the door trim. This opening is between the gallery and the kitchen.
January 7, 2009 -- The crown moulding is being finished in the master bedroom. Here you can see where it continues around the room.
January 7, 2009 -- Here is one of the windows fully trimmed out in the kitchen/great room. Notice the wood panelling below the window.
January 7, 2009 -- The beaded board panelling is started in bath 2. Some of the other trims have to be finished before the top rail can be installed.
January 13, 2009 -- Color swatches have been painted on the walls to aid in the interior color selection.
January 13, 2009 -- All of the fireplace wall trim is installed with the exception of the mantle. It will be installed after the stone around the firebox.
January 13, 2009 -- The large crown moulding circles around the entire great room. Good progress has been made on installing that this week.
January 13, 2009 -- This is the crown moulding in the study. It was challenging to run down the slope and along the angled ceiling, but we did it.
January 13, 2009 -- The master bath shower tiles have now been finished and grouted. They will have a wood trim around the top edge and down each side.
January 13, 2009 -- The laundry cabinets were installed today. They will have Corian counter tops on them.
January 13, 2009 -- The brick step is now built and the columns finished. The front facade is now complete.
January 15, 2009 -- The powder room vanity has its plywood top and is now ready for the tile guy to install the tile.
January 15, 2009 -- The computer desk and hutch have been installed and are ready for thier countertop and finish.
January 15, 2009 -- The trim continues to go up! This is the opening from the great room to the foyer.
January 15, 2009 -- The crown moulding is going up around the foyer. It is the same as the large crown in the great room.
January 15, 2009 -- The crown moulding is up in the entry way as well as the rest of the master bedroom suite.
January 17, 2009 -- The grouting is now finished in the shower of bath 3. Epoxy grout was used so that it would not stain, crack or mildew.
January 17, 2009 -- The floor of bath 2 is now redone and grouted. This also has epoxy grout which makes cleaning a lot easier.
January 17, 2009 -- The tiled countertop in the powder bath is now finished. It is a little dusty now but it will clean up and look nice once its copper sink is installed.
January 19, 2009 -- The garage workbench was completed today. It will have a refrigerator on the left and a sink on the right. A shelf will go in the middle eventually.
January 20, 2009 -- The studio tub/shower unit was installed today. A wall and drywall will have to be built around it to finish it.
January 21, 2009 -- The master bath tub surround was built today. There is an access panel to get to the plumbing on the left side.
January 21, 2009 -- Here is another view showing the curvature and the access panel. The access panel is the flat area on the left.
January 26, 2009 -- The front yard has been cleared and cleaned in anticpation of the beginning of landscaping.
January 26, 2009 -- The trim in the foyer is coming along nicely. The wall "panels" are almost complete.
January 26, 2009 -- The stair skirt and risers are installed and ready for the treads as soon as they arrive.
January 28, 2009 -- This is a gable window in the studio. From here you can see the fly fishing pond beyond (as well as our temporary construction fencing).
- Click Here to return to the Past Projects Page
- [Home]
- [News]
- [Past Projects]
- [Campbell]
- [Causey]
- [Elloree]
- [Gitlitz Cottage]
- [Gitlitz Garage]
- [Griffin]
- [Groman]
- [Historic]
- [Hoats]
- [Keller]
- [Kumar]
- [Langford]
- [Lord]
- [May 08]
- [Jun 08]
- [Jul 08]
- [Aug 08]
- [Sep 08]
- [Oct 08]
- [Nov 08]
- [Dec 08]
- [Jan 09]
- [Feb 09]
- [Mar 09]
- [Apr 09]
- [May 09]
- [Jun 09]
- [Jul 09]
- [Sep 09]
- [Lowcountry Plantation]
- [McCormack]
- [McNeil]
- [Ponds]
- [Rizer]
- [Schuld]
- [Weiss]
- [Select A Builder]
- [Services]
- [FAQ]
- [Contact Us]
- [About Us]
- [Testimonials]
Copyright, 2009, Ponds & Sons Construction Company, Inc. dba Ponds & Sons