November 10, 2006 -- Piers have been laid. Tie down steel is protruding for attachment to the flooring system.


November 13, 2006 -- The rim joists and girders are being placed and tied down.


November 13, 2006 -- A close up of the girder system.


November 14, 2006 -- Joists are in place. The firebox has been assembled.


November 14, 2006 -- The firebox has a fire brick in a beautiful herringbone pattern.


November 14, 2006 -- Flooring is beginning.


November 15, 2006 -- The flue and flue liner are in place. The chimney is about 25 feet high.


November 16, 2006 -- The floor is in place. Studs are being assembled.


November 17, 2006 -- A view from the back.


November 17, 2006 -- Wall studs are in place. Wall sheathing is being installed.


November 20, 2006 -- The front porch decking is in place.


November 21, 2006 -- Ridge beams are installed over the bedrooms (one on each end).


November 27, 2006 -- The ridge beam is installed over the living room.


November 28, 2006 -- Wall sheathing continues. Rafters are being installed.


November 29, 2006 -- The barge rafter is held in place by lookouts on the gables.


November 30, 2006 -- Short rafters are installed over the front foyer.